Construction Meeting #011

Sachin and I visited the site today and the list below are some of the things we reviewed

  • Loggia height and potential arches
  • Stair in Living Room - will probably work fine as a normal stair rather than free floating as designed.
  • The Southern curved

Read more…
0 Replies

Construction Meeting #010

Had a site meeting today reviewing the following:

  • Ceiling Soffits in Kitchen and down the Dining Gallery (for mechanical soffit) - modified A6.1 - now as Delta 5
  • Added Mechanical doors (size to match requirements for pool equipment needs and field c

Read more…
0 Replies

Construction Meeting #009

On 9/16/14 we had a construction meeting with Sachin, Vanita, Mike, Joe and myself.  Below are the list of items we when over - with comments in Red

- Laundry Sink - Keep it in current location
- Washer / Dryer - Keep it in current location
- HVAC in

Read more…
0 Replies

Construction Meeting #008

Meeting on 8/19 covered the following items:

  1. Reviewed concerns again about having the half-inch threshold difference in the large doors and the hardscape in the rear courtyard area.  Sachin wants to maintain this but both Mike and Tim mentioned that

Read more…
0 Replies

Construction Meeting #007

Items reviewed in meeting on 8/1/14 - comments in Red

- Mud Room - door change -secondary laundry location / bench / pocket door - Mud room garage door shift to the right (from current framed location) to allow of bench on west wall of mud room.  Mo

Read more…
1 Reply

Construction Meeting #006

Construction Meeting with New Framer (Joe), Mike and Sachin.  Below is a list of items Sachin had that he wanted to go over for the meeting (comments in red) :

- Sheet Metal for Termite Proofing - reviewed detail locations

- Water Proofing - Retaini

Read more…
0 Replies

Construction Meeting #005

Met with Sachin, Mike and the Framer out at the site to go over floor and sub-floor framing issues.  We also discussed sub-floor access and the exterior walkway around the north side of the house and near the pool.  The loggia area near the front of

Read more…
0 Replies

Structural Drawing Update

Hi Tim:
I've attached pdf's of the delta 4 revised structural drawings I dropped off on Friday.  I've also attached the calcs that need to go to the County along with the revised prints.
Regards,
Joe
==========
Drawings have been added to AllyLocal.c

Read more…
0 Replies

Construction Meeting #002

Attendees:  Mike Murphy, Todd Mink, and myself.

Topics Discussed (please reply to add additional comments or topics as needed):

1. Grading:  Mike wanted to visually verify the sub-floor depth - eyeing it (not with accurate survey at the time of vis

Read more…
0 Replies

Contruction Meeting #001

Attendees:  Sachin Aggarwal, Mike Murphy, Todd Mink, Marco Lopez and myself.

Topics Discussed (please reply to add additional comments or topics as needed):

1. Schedule:  We are going to trying to compress the construction schedule to try to comple

Read more…
0 Replies

Pemit Issued

The Permit has been issued with No Structural or Architectural Comments.  The Aggarwals have made some slight changes plan however primarily pushing out Dining Room a bit and modifying the Balcony.  The Media Room area changed as well in addition to

Read more…
0 Replies

Minutes of Meeting with Tim

1. Rounded Entry Maintained

2. To remove one stair on the North of Living Room (near Gallery) to provide space for Formal Dinning
3. Butler Pantry to be removed nd use that space for Hutch
4. To modify / redesign the other remaining stair (wine stair

Read more…
0 Replies

Structural Meeting from 9/16

From Joe McHale:

 

The following is a summary of items discussed with Tim during our meeting last week:

1.  The future elevator shaft will be framed in as closets at each floor level such that the floor framing can be removed later as desired.

2.  I

Read more…
1 Reply

Flooring

Main Level: Use Granite Slabs  in the Living Area. Granite / Marble Tiles in the wine room, guest suite, office, dining, 2nd master suite, Gallery, Prayer Room (White Marble), Kitchen and Great Room...

Elevator: Carpet

Main Stairs - Wood horizontal

Read more…
7 Replies