Construction Meeting with New Framer (Joe), Mike and Sachin. Below is a list of items Sachin had that he wanted to go over for the meeting (comments in red) :
- Sheet Metal for Termite Proofing - reviewed detail locations
- Water Proofing - Retaining Walls - reviewed detail locations
- Insulation- reviewed detail locations and sound walls / floor and ceiling for 2nd Master.
- Ducts - - reviewed the option to have ducts in dropped ceilings and soffits for upper level
- Sub-Floor Vents- reviewed the sides and expressed desire to "over-vent" beyond requirements
- Sub-Floor Cleaning- Mike mentioned that sub-floor was cleaned
- Thick Mortar Set- Mike mentioned we could still do this (to prevent cracking of natural stone)
- Refrigerator Point / Minivac / Broom Cabinet- reviewed
- Toilet / Powder Room Plumbing Question by Jeff- reviewed
- Sound Proofing the Floors- reviewed per above
- Cast Iron Plumbing for Toilets at Upper Level- reviewed
- Gas Lines to Cabana, BBQ and Under Balcony- reviewed
- Plumbing - Water, Drain and Gas- reviewed
- HVACs - Heaters- reviewed
- Mud Room - door change -secondary laundry location- reviewed and marked on plans
- Wine Room change to Closet / Recess by Fountain- reviewed and marked on plans
- Garage 2 Opening / Concrete- reviewed
- Garage Grade for Guest Suite- reviewed
- Prayer Room- reviewed
- Fountain Location- reviewed
- Plumbing for BBQ / Sink- not reviewed
- Plumbing for Outdoor Shower- not reviewed
- Water Pressure Upper Level- not reviewed
- Cabana Walls- not reviewed
- Kitchen Window- reviewed and marked on plans
- Master Bedroom Windows- reviewed and marked on plans
- Bedroom Suite 4 Window- reviewed and marked on plans
- Door Heights- reviewed
- Plumbing - Water, Drain and Gas- reviewed
- HVACs - Heaters- reviewed
- Mud Room - door change -secondary laundry location- reviewed and marked on plans
- Garage 2 Opening / Concrete- reviewed
- Garage Grade for Guest Suite- reviewed
- Prayer Room- reviewed
- Fountain Location- reviewed
- Plumbing for BBQ / Sink- not reviewed
- Plumbing for Outdoor Shower- not reviewed
- Water Pressure Upper Level- not reviewed
- Cabana Walls- not reviewed
- Kitchen Window- reviewed and marked on plans
- Master Bedroom Windows- reviewed and marked on plans
- Bedroom Suite 4 Window- reviewed and marked on plans
- Door Heights- reviewed
+++++
In addition to the items above we reviewed the architectural details with Joe (the new framer), including the recess doors and windows.