Structural Meeting from 9/16

From Joe McHale:

 

The following is a summary of items discussed with Tim during our meeting last week:

1.  The future elevator shaft will be framed in as closets at each floor level such that the floor framing can be removed later as desired.

2.  I need a revised roof plan (dwg) and sections.

3.  I need the site plan (dwg's) to show the perimeter retaining walls on the foundation plan.

4.  We will need a wing wall between the kitchen and breakfast area to transfer shear from the second floor diaphragm to the foundation.  I will let Tim know what's needed when I finish the lateral analysis.

5.  Eliminate the small window at the office.

6.  At the cabana, we will need shop-fabricated steel tube columns for lateral load restraint.  The alternative is to exchange the round columns for Strong-walls at the corners.

7.  I need to know where the furnaces and water heaters will be located in the garages to show foundation block-outs for ducting and to avoid locating shearwalls where ducts will penetrate walls.

8.  The location of the doorway at the guest room needs to be resolved.

Feel free to contact me with questions.

You need to be a member of allylocal.com to add comments!

Join allylocal.com

Email me when people reply –

Replies

  • RE: item # 1 - so the elevator is out? will we need power source for future elevator?

     

    Mike Murphy

This reply was deleted.
google-site-verification=wLfGnbtX8dngPdp2s-cVs-seE_1oaDtuyXB-r0jf5mE