Meeting on 8/19 covered the following items:
- Reviewed concerns again about having the half-inch threshold difference in the large doors and the hardscape in the rear courtyard area. Sachin wants to maintain this but both Mike and Tim mentioned that a trench drain will be needed to help protect water intrusion in a storm (and this is no guarantee that there will be no water intrusion).
- Reviewed the height of the cabana finish floor compared to the house (cabana should be lower).
- Reviewed the removal of the post next to the powder room stair
- Reviewed the landings and the beams at the top of the main stair (we will come up with a detail to make the transition look good - it will be decorative not structural)
- Looked at the beams on the bridge and plan on doing the crown as shown on the Reflected Ceiling Plan
- Reviewed the art glass and water fall option separating the office from the formal areas.
- Reviewed the media wall in the Great Room.