All Discussions (2)

Sort by

Permit Submittal

The permit package (Architectural / Civil / Structural / T24) have are all compiled and Marc and I are going to the building department to submit the Permit Package.

Brad -->> Can you upload your structural PDF files to this thread ? - thanks.

Read more…
1 Reply

Schematic Design

I've added the first conceptual drawing for you to review.  The drawings include an Existing and New Site Plan in addition to an Existing and New floor Plan.  Let me know what you think?

The Kitchen is a good size with a 48" Range, (2) 36 Sub-Zero (

Read more…
2 Replies
google-site-verification=wLfGnbtX8dngPdp2s-cVs-seE_1oaDtuyXB-r0jf5mE