3 Members
Join Us!

You need to be a member of allylocal.com to add comments!

Join allylocal.com

Comments are closed.

Comments

This reply was deleted.

Design Development

Brad - I've updated the plan per our discussion today - based on your discussion with Scott.  The plan was stretched 18" on both sides and 30" off the back to allow us to pour the foundation beyond the existing patio slab.

Read more…
0 Replies
google-site-verification=wLfGnbtX8dngPdp2s-cVs-seE_1oaDtuyXB-r0jf5mE