Design Development

Brad - I've updated the plan per our discussion today - based on your discussion with Scott.  The plan was stretched 18" on both sides and 30" off the back to allow us to pour the foundation beyond the existing patio slab.

You need to be a member of allylocal.com to add comments!

Join allylocal.com

Email me when people reply –
google-site-verification=wLfGnbtX8dngPdp2s-cVs-seE_1oaDtuyXB-r0jf5mE