Conceptual Design / Project Program
Quoted from Shri's 4/5/18 Email
I think if we do the permitting process in multiple phases/stages, we take first permit over-the-counter for building the structure 384 ft² to may be 550 ft²(which includes sheds) for building my office with small bat
2 Replies