I will post on this thread the most Current Construction Schedule (once we get it from Richard)
Below are a list of topics to discuss in meeting tomorrow (first set from Richard):
Decisions that need to be made:
1- Sheetrock or MDF beams
2- Roof tile selections, sample on site.
3-marble flooring selection, samples on site.
4-final location of kitchen sinks
5- selection of tubs for master and jr. master
6- selection of fireplaces. Tim do you hav prices from new fireplace guy? If not please obtain.
-
Tim do you have anything else?
----------
See additions to Richard's list per his e-mail below
7 - Front Door (we need to have something to go off of from images or show room visits as to personal preference so we can then narrow it down and / or design it)
8 - Need to define supplier for tubs, precast columns, outside window surrounds / eave foam details, marble, porcelain tile, counter tops, etc... so we can work within their catalog and work towards a price within budget.
9 - Surface or Cans in box beam ceilings (per e-mail yesterday)
10 - Prefab or Custom cabinets for closets
11 - Update Plumbing fixture selections so I can put together a fixture list like we did for Appliances
12 - Start on Electrical selections so I can put together a fixture list like we did for Appliances
13 - Have Richard post current construction schedule
14 - Add back in windows in Dining Room
15 - Tree protection fencing